+44 7778 003886 Kdhaliwal82@icloud.com

Have a Project in Mind?

Let’s Get Building!

Contact Info

Our Office

10 Brook Close, Stanwell

Staines-Upon-Thames TW19 7AW

UNITED KINGDOM

}

Open Office Hours

M-F: 8am – 6pm
S-S: 10am – 4pm
v

Get in Touch

Kdhaliwal82@icloud.com

v

Call us on

+44 7778 003886

Get In Touch

Build A Home Ltd ( frequently asked question)
can i really build the house any way i would like?

Each builder has restrictions on how flexible they will be, but generally speaking they are willing to allow you to modify the home to a certain point, so you have as much of a custom experience as possible.

How much does construction typically takes?

Slab foundations usually take between 90-120 days and basement foundations take around 120-135 days to construct.  However, delays such as weather, governmental codes, and permitting can delay that time frame.  Bare in mind that those estimates are based on our average 3000 sq. ft. build size.  A 6000 sq. ft.  home can take longer.

When do i start making payment on my new house?

If you don’t close on the home until after the home is built, your first mortgage payment is due the first month after closing. If you close on the home prior to it being built through the use of a construction loan, you begin payments upon the first month of closing on the construction loan.

How will I know when it is time to choose things like flooring, paint, fixtures, appliances, etc?

The salesperson working for the builder will outline a plan for this. The process is different with every builder, but they will have a plan to walk you through. As your Realtor, we will make sure you understand this process and are comfortable before you sign on the dotted line.

How will I know if the home is being built correctly?

Every municipality will conduct building inspections throughout the process to ensure the home is being built to code. We would also recommend you work with a private home inspector that is familiar with new construction and can inspect the home throughout the process. Your Realtor should be able to make a recommendation of an inspector who can monitor and report on the build at appropriate stages.

If I’m not 100% satisfied at the end of the build, what do I do?

You will be afforded the opportunity to do a final walkthrough at the end of the build. This is your opportunity to request that the builder fix or improve any finishing touches/issues before your final closing date/move-in date. The builder will work hard to do so, and if they don’t, you can ultimately choose not to close. However, this choice may cost you a per diem fee IF the city has already ok’d them to close on the home by issuing a certificate of occupancy.

Do your homes have a warranty?

All Cook Residential homes come with a 1 Year Builder Warranty at the time of closing.